|
If you have any
questions about
this site please
contact
Liz.
| |
|
|
Stone High School
Project Updates
Built 1949
Goal:
- To modernize various features of the building and update instructional
technology.
Key Elements of the Plan:
- Build new gymnasium
- Remodel pod two classroom
(flooring, ceilings, window blinds)
- Remodel pod three classroom
(flooring, ceilings, casework)
- Replace main entry door system
- Expand main office
- Install new electrical panels
- Increase secondary electrical distribution
- Upgrade security system
- Upgrade telephone system and install cable television as needed
- Replace exit hardware
- Install identification sign
- Replace boilers/ interconnect systems
- Replace unit ventilator
- Replace galvanized water main
- Install wireless infrastructure
- Abatement allowance
Features and Benefits:
- Remodeling will enhance classroom atmosphere
- Expansion of the main office will improve security and operations
- Addition of new gymnasium will enhance physical education instruction
- New flooring, ceilings, casework and window treatments will improve
classroom atmosphere
- Wireless infrastructure, telephones, and cable television will improve the
technological capabilities for all curriculum offerings
Estimated Cost:
Target Completion:
|
|