Stone High School

Project Updates

Built 1949

Goal:

  • To modernize various features of the building and update instructional technology.

Key Elements of the Plan:

  • Build new gymnasium
  • Remodel pod two classroom
    (flooring, ceilings, window blinds)
  • Remodel pod three classroom
    (flooring, ceilings, casework)
  • Replace main entry door system
  • Expand main office
  • Install new electrical panels
  • Increase secondary electrical distribution
  • Upgrade security system
  • Upgrade telephone system and install cable television as needed
  • Replace exit hardware
  • Install identification sign
  • Replace boilers/ interconnect systems
  • Replace unit ventilator
  • Replace galvanized water main
  • Install wireless infrastructure
  • Abatement allowance

Features and Benefits:

  • Remodeling will enhance classroom atmosphere
  • Expansion of the main office will improve security and operations
  • Addition of new gymnasium will enhance physical education instruction
  • New flooring, ceilings, casework and window treatments will improve classroom atmosphere
  • Wireless infrastructure, telephones, and cable television will improve the technological capabilities for all curriculum offerings

Estimated Cost:

  • $2,975,700

Target Completion:

  • Fall 2007